Thursday, April 23, 2009

Shelves and sinks...

The garage has been converted to a finishing area. MANY shelves for the cabinets...


Waiting patiently for water and drain.
... and garbage chewage.

Always a comedian...

Always a comedian. She was all ready for school, including her shoes... then she stepped into Daddy's work boots and started clomping around the house.

Tuesday, April 21, 2009

Sneak peek...

The faucets aren't in yet, but they are scheduled for installation on Friday. So, here's a sneak peek!

One last "before" shot.
The slabs on the truck.
I think they did the "light" piece first.

Probably almost as much counterspace as my old kitchen had...
The stove had to come out so the corner piece could go in.
There are counters on both sides of the fridge now. Another huge improvement.

The project only has one seam.

More to come, AFTER the plumbing is in.

Monday, April 20, 2009

Cranky...

OK, tomorrow is one week since the countertops have been installed. I should be happy, right? The countertops are amazing, but we still have no kitchen plumbing.

Our faucet is on back-order, and the salesperson wasn't in today. We ordered these a LONG time ago, and found out about the back order a couple months ago. At that time, I found them online, cheaper, but we'd already ordered and they were figured into the plumber's portion of the bill.

So, no countertop photos until I have water that comes out of a tap in the kitchen and flows into a drain directly beneath it. It does not count that water comes out of the fridge and can be heaved out the patio door.

Good night.

Monday, April 13, 2009

Anticipation!

Tuesday is countertop day, so here's a last look around before the tops go on.



These boards are being used for shelving and drawer boxes. I hear they have a real attitude. Too bad we didn't design something with a curve?

Wednesday, April 8, 2009

More lighting!

Last week the electrician came back and finished up. He installed the under-cabinet lights...

...and added the outlets on the peninsula and for the dishwasher. On the riser section in the picture below, you can see slots cut for reinforcement for the "high" counter. We got word today that our countertops will be installed next Tuesday!

Since this post is mostly about lighting, I'll leave you with this picture Mick took from our front step. Happy Easter to all!

Thursday, March 26, 2009

Measuring up...

The countertops were measured yesterday. That means countertops and sink soon!

The fabricator used thin plastic to make templates of all the counter areas. Mick got to make a lot of decisions about overhangs, corners, faucet placement and edging around the sink. So exciting...




Tuesday, March 24, 2009

Building a tower, too!

Mick took on a side project -- tower construction!

Elizabeth helped with the hole for the floor sweep vac-pan.
The vac pan is in. The toe-kick is walnut.



The last cabinet to be built is the tall one that faces the dining room.The face frame.Putting it all together.

Using a jig to set the drawer glides for a drawer stack.

Next up: Elegant Stone Products will be here tomorrow to do the final measurements for the countertops.


Edited to add: I missed this photo in a previous post. She's a ham, through and through.

Wednesday, March 18, 2009

One complicated cabinet!

The end panel of the peninsula is complicated! The top is on the left, bottom on the right.

The panel pieces are fitted, except for the walnut toe-kick board. The third row from the bottom has a notch out because the counter height changes from standard to a raised section to hide the counters from the dining room.
Clamps rule!
Detail shot for the how-to crew. This is the "inside" view of the panel, where the height changes.
Further complicated by the angled corner on the front!
Assembled view!

Sunday, March 15, 2009

The second week of March...

The cabinet above the fridge has the boiled linseed oil applied. The one to the left does not. The oil really warms the color of the cabinets, but still keeps them natural looking.

Mick used a small cabinet that will go in the peninsula to help raise and hold the large upper cabinet to the right of the fridge. The right back edge of this one is exposed, so there was some scribing and fitting to get it fitted to the wall.

Here's the real bottom cabinet for that space, and a view looking down the entire west wall.
The west wall from the other end.

Saturday, March 14, 2009

The first week of March...

Elizabeth and Andrea went to Grandma and Poppa's house and Mick got out the clamps to assemble this complicated cabinet.

Much better! It's not installed, but it's ready to go.

Meanwhile, back at the stair corner, this cabinet got a lot of reinforcement to hold the granite countertop in front and the large upper cabinet in back.
Here's the monster upper!
Our neighbor Mary has been teaching Elizabeth to ski. This is their second outing. I think she's catching on!

Slacker!

Me, that is, not the one doing the cabinet work. I have a bit of catching up to do on web posts.

These photos finish out February. This is the first cabinet rounding the corner to the peninsula. The prefinished maple really makes a nice interior.
It's also a mugshot for the little one! Did anyone else do those profile tracings in elementary school?