Sunday, January 25, 2009

Catching up, again.

Here is "Cabinet 6". It is in the space between the window and the sliding door. There will be a peninsula under the light fixture.
This cabinet will go above the fridge. You can see the color change from applying boild linseed oil.
The dining room and kitchen decorative lights are installed.
The bathroom is done except for base trim, closet shelves, and trim around the doors. The light fixture, mirror and blinds finished what we will do for now.

The mind of a three year old

The mind of a three year old works in mysterious ways.

You can monkey-pile Daddy with your Dora doll and your favorite blanket...
... you can go computing and driving ...
... or you can just look cute!



Sunday, January 11, 2009

This corner just gets better and better!

Making cabinets requires a lot of clamps...

... really a lot of clamps!

Two more upper cabinets almost ready to go up. They are in two chunks, but it really should count as five cabinets. Both big sections will get two sets of double doors.
This one is placed on the floor below where it will be mounted. Two upper cabinets were built in one piece. When the clamps come off, this is what you get!

Monday, January 5, 2009

The first upper corner cabinets

The first four upper cabinets are in place. The microwave and stove are functional!

Sunday, January 4, 2009

The cabinet was hung in the corner with care...

I'm a bit behind on posting photos. This was December 28, installing the first cabinet.

I'll post more soon, there's more to see!